成人免费一级片|激情五月开心五月|av综合在线观看|亚洲无码黄片美女免费A片|深爱五月丁香五月婷婷|不卡视频黄片伊人综合一区|亚洲日韩一级A片|黄色片免费黄色片免费的|婷婷综合久久六月推荐|成人A片免费电影

Good news: Wuxi Chemical Equipment Co., Ltd. Won the Bid for the 100MV Heat Transfer Oil Trough-type CSP

In December 2018, WCE won the Bid for theoil and salt heat exchanger, which is the key equipment of the 100MV heat transfer oil trough-type CSP project of CSNP in Wulate Middle Banner.

As the first batch of CSP demonstration projects of the National Energy Administration, it is also the trough-type CSP project with the largest installed capacity. Located in Wulate Middle Banner,Bayan Nur City, Inner Mongolia, it is the largest CSP project in China. The project has a total investment of about 2.9 billion Yuan and covers an area of about 7,300mu. There are 375 trough-type heat collection loops, where the 10-hour power generation and energy storage device, the steam power generation system and the steam turbine generator set are respectively selected one loop from them. The project has the expected power generating capacity of 350 million kilowatt-hours upon completion.

WCE attaches great importance to the project and will provide strong support in project design, equipment manufacturing and installation, to smoothly implement the project.



Wuxi Chemical Equipment Co., Ltd.  All rights reserved | SuICP No. 07004455   |  Technical support :WUXILIEBAOTEC